Field guide / Magnetics & evidence
Magnetic survey deliverables: a data and QA checklist
Review a magnetic survey handoff for raw readings, base data, coordinates, processing history, coverage and interpretation-ready files.
The short answer
A magnetic survey handoff should let another technical reviewer trace a map back to its observations. Ask for raw and processed data, reference/base records, coordinate information, field exceptions and a processing description—not only coloured images. Agree the actual package in the scope before fieldwork.
What is the minimum useful data trail?
For a typical ground survey, request the original rover observations and relevant base-station records with their time information. Ask for a data dictionary explaining fields, units, identifiers and missing-value conventions. Confirm that original files are retained even when cleaned exports are supplied.
The processed dataset should be clearly distinguished from the raw dataset. It should be possible to relate a processed record to a line, location and acquisition period. UBC’s processing guidance describes time corrections and regional-field removal; the delivery notes should state which corrections were actually applied, not simply list every available processing technique.
Which QA questions should the handoff answer?
Can the reviewer see the acquired coverage rather than just the planned grid? Are gaps, repeats, rejected readings and access deviations explained? Are instrument or timing issues documented? Are the agreed repeat/control checks reported with their acceptance criteria and any exceptions?
Look at the base record together with the acquisition times. A label saying “diurnally corrected” is not enough to explain a gap in reference coverage or a disturbed interval. Ask what was removed, recollected or retained with a caveat. Set project-specific criteria with the technical lead; an arbitrary numerical tolerance copied from another survey may be inappropriate.
How should maps and grids be checked?
Open the point data, grid and map in the intended GIS environment. Check coordinate reference, units, extent, orientation and missing-data treatment. Compare a few known survey positions against the map rather than trusting a filename containing “UTM.” Confirm that exports do not silently shift or rescale the data.
Review gridding method, cell size, filtering and display limits. A smooth image can conceal sparse coverage or extrapolation beyond observations. Keep a coverage layer available beside the magnetic product. If derivative or transformed products are supplied, require their names, assumptions and intended uses to be explicit.
What makes the package ready for interpretation?
Include a short acquisition and processing report, a file inventory and a readme that identifies the final versions. Separate measured data, processed products and interpretive annotations. A suggested contact or target is an interpretation, not a new observation.
Before accepting the handoff, ask a reviewer who did not assemble it to open the files and reproduce the project view. Record any missing items and the agreed correction. This simple acceptance exercise can expose mismatched coordinate systems, unclear field names or a map exported from an earlier version while the crew’s records are still easy to clarify.
Your planning checklist
- Raw rover and relevant base observations retained.
- Time, coordinates, units and field names documented.
- Acquired coverage, repeats, rejections and gaps explained.
- Correction, levelling, gridding and filtering steps disclosed.
- GIS files opened and checked against known positions.
- Interpretations separated from measurements; final inventory reconciled.
Sources & further reading
Use official guidance for current requirements. These references support the subject matter; they have not reviewed or endorsed this article.
- UBC / GeoSci — Magnetic data processing ↗
- UBC / GeoSci — Magnetic survey design ↗
- US EPA — Magnetic Method ↗
General educational guidance, not legal advice, a site-specific technical design or a complete safety procedure. Confirm current requirements and project conditions with the responsible authorities and specialists.